MERCY HOMES PARK RESTORATION - JULY, 2017VALUE: $1,128,000.00
Scope:  Site clear & grub, import topsoil and fine grade, 400 CY concrete sidewalk replacement, playground restoration, basketball court installation, building foundation walls and stair installations, parking lot asphalt paving & striping, MSE wall installations
PROJECT MANAGER | ESTIMATOR: TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: James Mutlcher, Interstate Restoration
720-495-5863  jmutchler@interstaterestoration.com

TOWN OF JOHNSTOWN, CO PARKING FACILITY - JULY , 2017 - VALUE: $42,000.00        
Scope: Sub-grade preparation, haul off materials, survey, fine grade for asphalt
PROJECT MANAGER | ESTIMATOR: TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Gil Uhrich, Project Manager Apex Paving Solutions
C: 970-566-0302| E: guhrich@apexpvmnt.com

6229 FOURMILE CANYON DR. BRIDGE REPLACEMENT - BOULDER COUNTY COMMUNITY DEVELOPMENT BLOCK GRANT - DISASTER RECOVERY PROGRAM – JULY 2017– VALUE: $171,000.00
Scope: 30 foot steel beam and wood deck bridge replacement, survey, subgrade preparation, concrete abutments, dewatering, steel beam erection, wood beam deck installation, guardrails, riverbank rip rap protection, revegetation
PROJECT MANAGER | ESTIMATOR: TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Matt Betz, Boulder County Transportation Department
O: 303-441-1723| E: mbetz@bouldercounty.org

COLORADO DIVISION PARKS & WILDLIFE - CHERRY CREEK STATE PARK ROADWAY RESTORATION - MAY 2017 - VALUE: $45,000.00        
Scope: Subgrade preparation, haul off materials, survey, fine grade for asphalt
PROJECT MANAGER | ESTIMATOR: TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Gil Uhrich, Project Manager Apex Paving Solutions
C: 970-566-0302| E: guhrich@apexpvmnt.com
Contact: Paul Barker, CO PARKS & WILDLIFE
1-970-491-5031 paul.barker@state.co.us

MERECEDES-BENZ OF WESTMINSTER, CO - PARKING LOT EXPANSION  - DECEMBER 2016  - VALUE: $281,000.00
Scope: Import 9000 CY of soil material, excavation and finish grading for paving, installation of storm drain pipe and manholes, perimeter decorative fence installation.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Matt Lamar, L4 Construction
970-415-2695  mlamar@L4construction.com

Relevant Environmental & Civil Projects
Estimated, Project Managed, & Operated by:
Todd Burke & Steve Harrington

TOWN OF JAMESTOWN, COLORADO - FEDERAL NRCS / EWPP PROJECT - EMERGENCY STREAM RESTORATION, LITTLE JAMES CREEK - MARCH 2014 – COMPLETED, SUMMER 2014. - VALUE: $927,000.00                                
Scope:  Approximately 2 miles of stream / river emergency restoration to protect the Town of Jamestown from future flooding.  River re-alignment, channeling, grading, toe-wall and rip rap bank stabilization, road re-alignment, culvert & bridge repairs, and vegetation.  Import 7000 tons of granite, completed survey, debris removal, tree removal, and all construction activities to complete entire stream corridor.  Substantially completed on time.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD OPERATOR: GREG WINDELL, RICK BUCKLER
Contact: Graeme Aggett PHD, Lead Engineer AMEC (currently with Lynker Technologies)
970-294-5474  Email: gaggett@lynkertech.com
Contact: Tara Schoedinger, Mayor of Town of Jamestown
303-731-9269 Email: mayor@jamestownco.org

COLORADO DIVISION PARKS & WILDLIFE - GOLDEN GATE STATE PARK ROAD REPAIRS - GOLDEN, CO JUNE 2015 - COMPLETED, NOVEMBER 2015 - VALUE: ~$ 1,390,00.00
Scope: Parking lot improvements, subgrade stabilization, paving, chip seal, earthwork, shoulder repair, guardrail, revegetate, 
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Peggy Wilcox, PE
Colorado Division of Parks & Wildlife
Construction Project Manager
P: 303-291-7398 C: 720-456-8759 F: 303-291-7108
6060 Broadway, Denver, CO 80216
peggy.silcox@state.co.us
Contact: Paul Barker, CO PARKS & WILDLIFE
1-970-491-5031 paul.barker@state.co.us

8200 FOUR MILE CANYON, BOULDER, CO – CDBG FUNDED  BRIDGE  REPLACEMENT
FEBRUARY 2016  
VALUE: $210,000.00

Scope:  Bridge demolition, culvert and rip rap installation, new concrete abutments, new primary access bridge installation, river channel realignment, rip rap and boulder toe wall installation, riparian repairs, plantings & seeding
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: David Bangs, Van Horn Engineering 970-586-9388
Email: davidvhe@airbits.com
Contact: Kate Williams, Boulder County Transportation
303-441-1107  Email: kwilliams@bouldercounty.org

BRIDGE REPLACEMENT PROJECT, 51 WARD ST., JAMESTOWN, CO.  – CBDG FUNDED
COMPLETED 2016
VALUE: $53,296.00
                                                            
Scope:  Installation of new drop structures, new concrete abutments, new primary access pedestrian bridge installation, river channel realignment, rip rap installation, toe wall repairs
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
SUPERVISOR:  STEVE HARRINGTON | OPERATOR: GREG WINDELL
Contact: Tara Schoedinger, Mayor of Town of Jamestown
303-731-9269  Email: mayor@jamestownco.org
Contact: Kate Williams, Boulder County Transportation
303-441-1107  Email: kwilliams@bouldercounty.org

EBEN G. FINE PARK- STREAM & PARK RESTORATION - BOULDER, CO - FEMA FUNDS
NOVEMBER 2015 - VALUE: $ 438,598.00
Scope: Stream bank stabilization, 85 ton of boulder installation, custom sandstone steps, irrigation system installation, seeding. plantings, picnic benches, stamped concrete pads, concrete bike path, drop structures, crusher fine path
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Jason Messaros, PLA - Lead Architect
BHA Design Inc.
C: 970-223-7577
jmessaros@bhadesigns.com

COLORADO DIVISION PARKS & WILDLIFE - GOLDEN GATE STATE PARK MOUNTAIN BASE ROAD - REDI ROCK GRAVITY WALL INSTALLATION - OCTOBER 2014 - VALUE: $347,000.00                                                                                   
Scope: Installation of three gravity wall sections, guardrails, and signage along Mountain Base Road at the Golden State park in Colorado.  Includes excavation, balding and shaping, surveying, geotextiles, seeding and erosion control fabrics, gravity block retaining wall installation (a Redi Rock System).
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact:  Gene Potter, Design Engineer, Colorado Parks & Wildlife
303-291-7315  Email: gene.potter@state.co.us

BEAVER BROOK REDI ROCK RETAINING WALL GRAVITY WALL INSTALLATION
OCTOBER 2015 -  COMPLETED, NOVEMBER 2015 - VALUE: $ 204,360.00

Scope: Slope excavation, redi rock block MSE installation 1200 SF, drainage system. 
Contact: Clear Creek Colorado Transportation Department
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact:  Seth Clark, Design & Sales
Signature Stone, Greeley, CO
C: 970-539-2201 E: sclark@signaturestone.net

EVERT PIERSON KIDS FISHING PONDS RECONSTRUCTION – FEMA FUNDED - BOULDER CREEK PATH BOULDER, COLORADO - OCTOBER 2014 - NOVEMBER 2014  - VALUE: $480,000.00+
Scope: Pond reconstruction, riparian restoration, replacement of damaged fishing docks and bridges, resloping/grading, and earthwork, headwall and gate valve reconstruction, sod and irrigation system
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON
Contact: Jason Messaros, PLA - Lead Architect
BHA Design Inc.
C: 970-223-7577
jmessaros@bhadesigns.com

CEDAR CREEK AND ROAD IMPROVEMENTS - COMPLETED 2009 VALUE: $350,000.00
Scope: Installation of pre-cast box culvert and usage of an earth-filled cofferdam to divert creek water.
PROJECT MANAGER: STEPHEN HARRINGTON
Contact: Dave Buttles, Operations Manager 303-872-5233
Contact: Town of Montrose, Colorado, Purchaser 970-240-1480

8398 LEFT HAND CANYON, LEFT HAND CREEK RESTORATION - BOULDER, CO - AUGUST 2014 – NOVEMBER 2014
VALUE: $50,000.00
                                    
Scope: Hydrologic Engineering and planning, including 404 Permitting, and Flood Development Permitting. Construction involving Private Creek Restoration, Toe Wall Construction, Rip-Rap Bank Stabilization, and Wetland Revegetation.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD OPERATOR: GREG WINDELL, RICK BUCKLER
Contact: John Winchester, Hydrologic Engineer
303-258-3567 Email: jwinchester@highcountryhydrology.com
Jeff Crane, CWBG Grant Engineer
970-261-5043 Email: jeff@craneassociates.net

112 BOW MOUNTAIN ROAD, GRAVITY BOULDER WALL FLOOD REPAIRS - BOULDER, CO - COMPLETED SUMMER 2014
VALUE:  $110,000.00
                                                                      
Scope:  Slope stabilization project adjacent to residence due to a substantial landslide incurred during the heavy rains and flooding of 2013. Project included removal and offsite disposal of debris and sediment from landslide and construction of pioneered slope road, a 150’ tall retaining wall that included the import and placement of over 1600 tons of rock form the Left Hand Canyon area of Boulder. Temporary road construction and placement of riprap and boulders was also utilized to complete this project. 
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
Contact: Frank Harrison, Principal Geotechnical Engineer 303-877-7178
email: fharrison@m-west-assoc.com
Ben Day, Owner 720-938-4514 email: ben@ben-day.com

1213 17TH STREET, GRAVITY BOULDER WALL FLOOD REPAIRS - BOULDER CO - COMPLETED, SPRING 2014
VALUE:  $75,000.00
                                                                              
Scope: Slope stabilization project located at 1213 17th Street, adjacent to Boulder Creek. Todd worked with the City of Boulder to obtain the necessary ROW Permitting and Army Corps Permits needed to work in the wetlands area. This is a slope stabilization project in which a retaining wall will be constructed to mitigate future damage obtained from the 2013 flood and to secure slope failure below the 1213 17th St. residence.  Import of native rock boulder over 4-6’ in diameter, temporary culvert and equipment crossing over Boulder Creek, and drainage systems behind wall areas.  Debris, tree removal and river realignment.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
Contact: Frank Harrison, Principal Geotechnical Engineer 303-877-7178
Email: fharrison@m-west-assoc.com

4850 FOUR MILE CANYON, REDI ROCK GRAVITY WALL - BOULDER, CO - JULY 2014 – AUGUST 2014
VALUE: $50,000.00
                                                                                 
Scope: HMR Review, Study, and application process. Geo-Tech Engineering and consulting during design/build of Redi Rock Gravity Wall System. Septic engineering design, construction, and repair. Excavation and implementation of drainage systems.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
Contact: Frank Harrison, Geo-tech Engineering 720-529-5300
fharrison@m-west-assoc.com
Contact: Karen Bowen, Owner
303-854-7939 Email: karenskaya@yahoo.com

788 GOLD RUN FLOOD REPAIR -  ROCK GRAVITY WALL - BOULDER, CO - JULY 2014 – AUGUST 2015
VALUE: $50,000.00
                                                                                 
Scope: HMR Review, Study, and application process. Geo-Tech Engineering and consulting during design/build of Redi Rock Gravity Wall System. Septic engineering design, construction, and repair. Excavation and implementation of drainage systems.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
Contact: Frank Harrison, Geo-tech Engineering 720-529-5300
fharrison@m-west-assoc.com

DESIGN/BUILD, BRIDGE REPLACEMENT PROJECT, EVERGREEN, CO. - SEPTEMBER 2014 - VALUE: $50,000.00+                                                                
Scope:  Structural Engineering and Construction of pre-cast concrete culvert and Redi Rock wing wall bridge. Hydrology engineering analysis of creek flow under bridge destroyed by flooding.  Structural analyses and engineering, Redi Rock retaining wall rock protection system, and construction of both bridge and walls.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
SUPERVISOR:  STEVE HARRINGTON | LEAD OPERATOR:  RICK BUCKLER
Contact:  Joel Ambrosino , P.E., Gebau Engineering
303-444-8545  Email:  joel@gebau.com
Contact:  John Hall, Owner
615-715-4346  Email:  johnh6975@gmail.com

KNOLLWOOD TENNIS COURT FLOOD REBUILD PROJECT - CITY OF BOULDER, CO - SEPTEMBER 2015  
VALUE: $293,900.00

Scope: Re-construction of two tennis courts, wood wall demo and reconstruction, tennis court surfacing and concrete slab, import fill and earthwork.
PROJECT MANAGER | ESTIMATOR:  TODD BURKE
LEAD SUPERINTENDENT | OPERATOR:  STEPHEN HARRINGTON

 

 